South Entrance
Upper South Road
Ravine view
Communal pool at night
South entrance roundabout
Communal Pool
Orchard
Ravine view
Southern view over the 7th hole
Upper South Road
Communal pool
Communal pool at night
North Road
Communal pool at dusk
Southern View
Aphrodite Hills entrance view
Communal pool at night
Communal pool at dusk
Communal pool
Communal pool at night
Communal pool at night
Communal pool at dusk
Communal pool at dusk
Communal pool at dusk
Communal pool
Communal pool at dusk
3 Comments

Adonis Village: Request for External Change –  Unit H2

Description of proposed external change:

A request is made by the owner of H2 for an external change to their property In line with the agreed Adonis Village procedure.


The owner would like to change the window into a full length design and slightly move the wall outwards taking part of the balcony area, as shown on the diagram below. The proposed new wall is shown in a thick red line. The plan is to move it out only in line with the existing front line of the dining room, and not all the way to the line of the existing lounge.


The work will be carried out by A. EFTHYMIADES & C. IOANNOU CONSULTATING & BUILDING ENGINEERS LTD so it will be completely in line with the Village existing materials and colours. This company is well known to cybarco and has an excellent reputation. The window will be of similar design will the exception of it being sliding and incorporating a mosquitos net.


As it is on the first floor at the rear of the property, and in a recessed area, it will hardly be noticeable from the road, and will not be overlooked by any other Adonis property.


The owner would like to go ahead with this change as soon as possible following the end of the Request for Change process.

 

Dimensions and sizes of external changes:

 

Colours and style of materials to be used:

To be completely in line with the Village existing materials and colours. 

The window will be of similar design with the exception of it being sliding and incorporating a mosquitos net.

 

Images or plans of site where external change will be made:

Any images from suppliers of materials to be used:

 
Say something here...
Cancel
You are a guest
or post as a guest
Loading comment... The comment will be refreshed after 00:00.
  • This commment is unpublished.
    AV Committee · 14:25 03/02/2022
    The Adonis Village Management Committee has received the above External Change Request (ECR) from the owner of H2 and is now being EVALUATED. All owners may contribute their view in response to this request by adding comments here and the owners may also add further information if required.
  • This commment is unpublished.
    AV Committee · 14:33 03/02/2022
    Dear H2 Owner, your ECR mentions a plan of the proposed change. Could you please provide this so that the ECR can be fully evaluated before a final decision is made?
  • This commment is unpublished.
    Demetris Aspromallis · 21:24 16/09/2022
    Is this approved? Where is the plans showing all the changes.