South Entrance
Upper South Road
Ravine view
Communal pool at night
South entrance roundabout
Communal Pool
Orchard
Ravine view
Southern view over the 7th hole
Upper South Road
Communal pool
Communal pool at night
North Road
Communal pool at dusk
Southern View
Aphrodite Hills entrance view
Communal pool at night
Communal pool at dusk
Communal pool
Communal pool at night
Communal pool at night
Communal pool at dusk
Communal pool at dusk
Communal pool at dusk
Communal pool
Communal pool at dusk
6 Comments

Adonis Village: Request for External Change –  Unit F1

Description of proposed external change:

We would like to make the renovation works at the villa F1, according to the rules of Adonis village. This renovation includes internal works (partitions, floors, painting, etc) and external.

According to the meeting 06-06-2022 with Committee representatives (Roger and Clair) we have made some changes to our plans, that should meet Village requirements. Please see below updated list of external changes and the drawings:
1. Basement:
a. making a window near the roll door

2. Ground floor:
a. extension of the main entrance, including the replacement of the door and adding new window
b. changing the window into wide sliding glass doors

2. First floor:
a. adding the new bedroom instead of veranda

Dimensions and sizes of external changes:

According to the drawings

 

Colours and style of materials to be used:

All works will be done in line with the Village existing materials and colors. All windows will be similar design as the existing ones.  

Images or plans of site where external change will be made:

111.jpg

22.jpg33.jpg

2022-07-19_F1_drawings_for_Adonis_Committe_Rev2_2022-07-19_12-44-08.jpg

2022-07-19_F1_drawings_for_Adonis_Committe_Rev2_2022-07-19_12-44-49.jpg

 

Any images from suppliers of materials to be used:

 

Say something here...
Cancel
You are a guest
or post as a guest
Loading comment... The comment will be refreshed after 00:00.
  • This commment is unpublished.
    AV Committee · 01:37 12/05/2022
    The Adonis Village Management Committee has received the above External Change Request (ECR) from the owner of F1 and it is now being EVALUATED. All owners may contribute their view in response to this request by adding comments here and the owners may also add further information if required.
  • This commment is unpublished.
    AV Committee · 07:28 14/07/2022
    The Adonis Village Management Committee has received an amendment of the above External Change Request (ECR) from the owner of F1 and it is now being RE-EVALUATED. All owners may contribute their view in response to this request by adding comments here and the owners may also add further information if required.
  • This commment is unpublished.
    AV Committee · 13:14 19/07/2022
    The Adonis Village Management Committee has received a further amendment of the above External Change Request (ECR) from the owner of F1 and it is now being RE-EVALUATED. All owners may contribute their view in response to this request by adding comments here and the owners may also add further information if required.
  • This commment is unpublished.
    Roger Weedon · 14:04 19/07/2022
    Hi ,

    I can confirm that my wife and I together with Svetlana met with representatives of the owner of F1 and discussed the previous plans submitted for the refurbishment of F1.
    I can confirm we raised concerns over a number of the areas proposed and the most recent plans submitted addresses some of the issues as follows:-

    Basement.
    have removed the proposal to incorporate the garage into internal living space, changing the external look of the rear of the property and removing the only designated parking area for the property. Also they have removed the provision of a window to the side which overlooks the front of F2. The proposed window to the elevation facing L block is in keeping with a number of other properties along this side of the pool.
    Ground floor.
    The infill to the veranda is in keeping with at least one other like property along this side of the pool,provided the style of opening veranda doors is in keeping with the overall style and colour.The window/door to the side of this extension faces F2 and may be cause for concern.The changes to the front door area appears similar to changes to other properties on the village.

    First floor.
    Overall the proposal will increase the potential for more occupation either domiciled or holiday letting, together with the vehicular traffic and parking.

    Roger WEEDON G1
  • This commment is unpublished.
    Demetris Aspromallis · 21:21 16/09/2022
    is this application approved as submitted? I havent seen and amendments as noted below.
  • This commment is unpublished.
    AV Committee · 13:19 20/10/2022
    Taking each floor into consideration separately:

    BASEMENT:

    Interior works do not need MC approval but must adhere to Building Regulations.

    The installation of a window next to the garage door, in accordance to the drawings which have been submitted for consideration by the MC, IS APPROVED but MUST be a window in keeping with the Adonis Village size, style (including paint-brush effect) and colour of similarly located windows at AV and either sourced from the current list of pre-approved suppliers or will require MC pre-approval if not.

    GROUND FLOOR:

    Interior works do not need MC approval but must adhere to Building Regulations.

    The filling-in of the covered porchway IS APPROVED in accordance to the drawings submitted.

    The replacement door and windows to be used on the Ground Floor MUST be in keeping with the Adonis Village size, style (including paint-brush effect) and colour and either sourced from the current list of pre-approved suppliers or will require MC pre-approval if not.

    NOTE: The proposed SLIDING DOORS for the kitchen ARE NOT APPROVED (since they do not conform to the size and style already in use at AV). However, the applicant has the right to address this non-approval at the October AGM by means of an owners vote if so requested.

    FIRST FLOOR:

    Interior works do not need MC approval but must adhere to Building Regulations.

    The proposal for a MASTER BEDROOM and ENSUITE BATHROOM EXTENSION to be built above the dining room and living room IS NOT APPROVED.

    NOTE: At the 2020 AGM the owners rejected a proposal to permit further external alterations, such as extensions, any to which a precedent for the exact same alteration had not previously been established and so this directive from owners is considered still valid. However, the applicant has the right to address this non-approval at the October AGM by means of an owners vote if so requested.