South Entrance
Upper South Road
Ravine view
Communal pool at night
South entrance roundabout
Communal Pool
Orchard
Ravine view
Southern view over the 7th hole
Upper South Road
Communal pool
Communal pool at night
North Road
Communal pool at dusk
Southern View
Aphrodite Hills entrance view
Communal pool at night
Communal pool at dusk
Communal pool
Communal pool at night
Communal pool at night
Communal pool at dusk
Communal pool at dusk
Communal pool at dusk
Communal pool
Communal pool at dusk
1 Comment

Adonis Village: Request for External Change –  Unit R2

Description of proposed external change:

Installation of a single solar panel for the provision of domestic hot water. The panel will be installed on the flat roof above the right side of R2 unit. The panel will be installed on an elevated frame that holds the panel in place, rising from 5cm above the ground to 60cm from the ground. Two water pipes will be installed on the exterior wall, and painted the same colour as the wall, running vertically 420cm down the wall from the roof to the connection point into the ceiling of R2, to connect the solar panel into the existing hot water emersion heater tank inside the flat.

Dimensions and sizes of external changes:

The solar Panel is 100cm wide and 150cm long 

The two water pipes will each be 420cm in length and 2.8cm in diameter

Colours and style of materials to be used:

 The solar panel will be black but will not be visible

The two water pipes will be painted the same colour as the external wall colour and will blend into the wall.

Images or plans of site where external change will be made:

 R2_solar_panel_plan_May_2022.jpg

R2 2022 Solar Heating

 

O1R2 2022 Solar Heating

Any images from suppliers of materials to be used:

 

Photo_of_a_solar_panel.jpg

Standard solar panel and two copper water pipes

 
Say something here...
Cancel
You are a guest
or post as a guest
Loading comment... The comment will be refreshed after 00:00.
  • This commment is unpublished.
    AV Committee · 23:22 16/05/2022
    The Adonis Village Management Committee has received the above External Change Request (ECR) from the owner of R2 and it is now being EVALUATED. All owners may contribute their view in response to this request by adding comments here and the owners may also add further information if required.