South Entrance
Upper South Road
Ravine view
Communal pool at night
South entrance roundabout
Communal Pool
Orchard
Ravine view
Southern view over the 7th hole
Upper South Road
Communal pool
Communal pool at night
North Road
Communal pool at dusk
Southern View
Aphrodite Hills entrance view
Communal pool at night
Communal pool at dusk
Communal pool
Communal pool at night
Communal pool at night
Communal pool at dusk
Communal pool at dusk
Communal pool at dusk
Communal pool
Communal pool at dusk
3 Comments

Adonis Village: Request for External Change –  Unit Q1

Description of proposed external change:

We would like to request approval for the installation of solar panels on our roof. 

 

Dimensions and sizes of external changes:

Colours and style of materials to be used:

Images or plans of site where external change will be made:

Any images from suppliers of materials to be used:

 
Say something here...
Cancel
You are a guest
or post as a guest
Loading comment... The comment will be refreshed after 00:00.
  • This commment is unpublished.
    Warren Furneaux · 20:38 13/03/2024
    Hi Sigrid. Please would you submit specific details about the proposed installation by completing the other 4 points? (You can refer to previous ECR applications for guidance). Best regards, WF

    Dimensions and sizes of external changes:

    Colours and style of materials to be used:

    Images or plans of site where external change will be made:

    Any images from suppliers of materials to be used
  • This commment is unpublished.
    Sigrid and Sabah Aziz · 19:29 02/04/2024
    9 panels standard — Jinko Tiger Neo, 440W with opimizer,
    Standard panel colour, size 1.73 m x 1.13 m/each panel
    Inverter Huawei Sun2000 - fixed next to electricity box or inside garage

    Photo of panels setup att (colour in the photo for view only)

  • This commment is unpublished.
    AV Committee · 13:41 05/04/2024

    The external change request regarding the installation of solar panels above Q1 outlined above is APPROVED CONDITIONALLY, subject to the following conditions:

    1) All owners of Q block must confirm their consent for the installation. Q block owners will be notified by email and given 28 days to object.

    2) Panels to be installed must not protrude beyond any ridge line (top & side) on either of the 2 planes being used.

    Work must NOT commence until the above two conditions are satisfied.