Adonis Village: Request for External Change – Unit A1
Description of proposed external change:
I recently purchased the unit and I found out water leaks all over the floors due to a pinholes and cracks on the copper pipes under the tiles (see attached pictures)
I will be doing a new repiping through out the house, I will be running all pipe in pipe system on the exterior wall of the bathrooms having 2 access valve control boxes. I will then cover the wall over the pipes with insulation plaster and paint (see attached pictures)
Dimensions and sizes of external changes:
Colors and style of materials to be used:
same paint as it is now
Images or plans of site where external change will be made:
Any images from suppliers of materials to be used: